Salvage, refurbish and re-installation of SPM along with floating hoses, subsea hoses and mooring hawser.
Load out calculations, sea fastening design and transportation analysis of modules.
Sea fastening design and transportation analysis of 5,400 MT topside.
Project management of Installation of SPM and commissioning.
Project management of the subsea pipeline installation including spool, riser and pigging stations.
Mooring system design, design of Floaters for solar arrays and CFD Analysis of Solar Arrays.
Basic design, detailed design and project management of 4,000 MT tanker.
Detailed design of Jack-up barge.
Dynamic Lift Analysis for jacket installation using crane barge.
Yacht upgrade engineering and project management.
Salvage engineering for cutting and removal of Jacket and transportation to onshore.
Pipelay analysis for 8”, 10”, 12”, 14”, 18”, 24”, 30” & 42” pipes, Bow string startup, DMA start up, A&R Analysis, Davit Lift Analysis, Spool and riser installation analysis.
Decommissioning engineering of Arzana field for the removal and transportation of monopods, Tripods, platform, bridge and flare tower.
Jacket launch analysis of 9, 600MT Jacket including Stability Analysis, Longitudinal Strength check and Jacket Wet Tow Analysis.
Jacket Docking analysis on pre-installed conductors.
Basic design of Jack up Barge.
Subsea installation analysis including static and dynamic cable lay analysis.
The basic and detailed design of Aluminum crew boat and construction support.
Design of Calm Buoy Mooring System including procurement and construction support.
Basic design of double decker jack-up barge.